WAPDA ENVIRONMENT CELL (WEC) PRIVATE

 Background

 

The Wapda Environment Cell (WEC) was created in 1989 to address environmental aspects of WAPDA projects in both Water and Power Wings. For capacity building of WEC, the Asian Development Bank, in 1993, offered Technical Assistance for the Strengthening of Environmental Management for Water Resources Projects of WAPDA with an overall objective to ensure that WAPDA's water resources projects and programs will be environmentally sound and so result in sustainable socioeconomic development. To achieve this goal, the Technical Assistance Program focused on two key objectives.

 

·     To strengthen, upgrade and enhance the technical capability of environmental management in the already existing WAPDA Environment Cell (WEC).

 

·     To recommend an institutional framework and linkages that would enable effective application of this capability within WAPDA and within national framework of environmental institutions.

 

Under this Technical Assistance Program, in-house, on-the-job and foreign training was provided to WEC staff by the consultants engaged specifically for this purpose. The training focused on Environmental Impact Assessment (EIA) and review, Management and Environmental Monitoring & Evaluation System of water sector projects of WAPDA. It was also recommended that WEC should serve as a focal point for handling environmental assignments and to develop an environmental information system to support, planning, design and operation of projects in Water and Power Wing of WAPDA.

Organization

Wapda Environment Cell (WEC) is presently functioning under the administrative control of General Manager (Technical Services).  Realizing the importance of environmental aspects of water resources projects, a post of Director General (WEC) was also created and now DG (WEC) heads Wapda Environment Cell.

Staff strength of the organization is 12, which consists of a Director, 4 Deputy Director level posts of different disciplines, 5 Research Officers of different disciplines, and a Civil Engineers.

Achievements

WEC, on the basis of in house, on-the-job and foreign trainings of its staff, and gradually accumulating experience has completed the following Initial Environmental Examinations (IEEs), Environmental Impact Assessments (EIAs), Environmental Management Plan and Resettlement Action Plan for many projects of national importance.

 

  1.          Environmental Impact Assessment (EIA) of Chashma Right Bank Canal Stage-I & II, Chashma Right Bank Irrigation Project (CRBIP)

  2.         Initial Environmental Examination (IEE) of Chashma Right Bank Canal Stage-III Chashma Right Bank Irrigation Project (CRBIP)

  3.         Environmental Management Plan of Chashma Right Bank Irrigation Project (CRBIP)

  4.         Initial Environmental Examination (IEE) of Mangi Dam Project.        

  5.         Initial Environmental Examination (IEE) of Sabakzai Dam Project               

  6.         EIA of Fordwah Sadiqia Remaining Project (FSR), Bahawalnagar.                            

  7.         Initial Environmental Examination (IEE) of Naulong Storage Dam.

  8.         Rehabilitation of Manka and Kappar Drains of D.G.Khan.    

  9.         Environmental Monitoring of Evaporation Ponds of SCARP-VI.

  10.       Preliminary Environmental Study of Skardu Carryover Dam Project.

  11.       Environmental Study of Kachhi Canal with Barrage at Mithankot.

  12.       EIA of Kachhi Canal Off-taking from Taunsa Barrage.

13.       Initial Environmental Examination of Nai Gaj Dam Project.

14.       Preliminary Environmental Examination of Drainage Master Plan (DMP).

      15.       Resettlement Action Plan (RAP) of Sabakzai Dam Project.

16.       Environmental & Social Assessment (ESA) of 220 kV Kassowal Grid Station and Associated Transmission Line.

17.       Environmental Impact Assessment (EIA) of RBOD, Stage-III Project.

18.       Assessment of social and Environmental Monitoring of GBHP

19.       Environmental Assessment of Gurah Uttam Singh Project

20.       Assisted in hiring of Environmental & Resettlement Monitoring Consultants for GBHP.

21.       Social & Environmental Monitoring of GBHP– (2000 to 2007

22.       Assisted in hiring the Consultancy Services for Baseline studies for Environmental Monitoring of Evaporation Ponds and Adjacent areas of Fordwah Eastern Sadiqia (South) Project, May 1998.

23.       Initial Environmental Examination of Qaim Bharwana Biological Drainage Project.

24.       Environmental Assessment of Chashma Jehlam Link Canal.

25.       Cultural Heritage Impact Assessment (CHIA) study for Diamir Basha Dam project (through Consultants).

 

WEC Ongoing Projects / Studies

 

1. Environment Studies

2. Review of EIA Reports/Documents

     Wapda Environment Cell reviewed and offered valuable comments on the following reports prepared by the Consultants.

3. Clean Development Mechanism (CDM) Processing

4. Misc Assignments Completed