CJ-Link Canal

CJ-Link Canal off takes from Chashma Barrage on its left bank and conveys water to River Jehlum to meet the requirement of the canals off-taking at Trimmu Headworks on river Jehlum near Jhang. The link is an unlined earthen channel with a design capacity of 21,700 Cusecs, bottom width 380ft. and a full supply depth of 14 ft. WAPDA acquired about 10,800 acres of land for it's construction and 1130 acres for shelter belt plantation. The work on the Canal was started in 1967 and completed in 1971.

A Head Regulator of 8,000 Cusecs capacity for Greater Thal Canal has been provided at RD 180+200 on the right side of CJ-Link Canal.


SALIENT FEATURES

 

Length

64 Miles

Bed Width

380 ft.

Side Slope

2.5:1 & 2:1

Design Discharge

21,700 Cusecs

Design Depth

14 ft.

Bed Slope

1:10,000

Service Road

25 ft.

Structures

36 Nos.

Acquired Land

10,780 Acres

Contract Cost

210 Million Rupees

Commencement

11th January, 1967