EXISTING GENERATING CAPACITY

Type of Generation

Installed Capacity (MW)

Derated/Dependable Capacity (MW)

Availability (MW)

Summer

Winter

WAPDA Hydro

6444

6444 6250* 2300*
GENCOs 4829 3580 2780 3150**
IPPs (incl Nuclear) 6609 6023 5309 5662**
Rental 285 264 250 250**

Total

18167 16311 14589 11362

*   Hydro availability based on last 5 years average
** Excludes 12% (as per actual 2007-08) Forced Outages for GENCOs and 6.0% (contractual) for
    IPPs & Rental. Rental Subject to availability of gas