LAND &
WATER MONITORING / EVALUATION OF | |||
| 1 | LOCATION | ||
| Land and Water Monitoring / Evaluation of Indus Plain for all over
Pakistan. | |||
| 2 | SCOPE OF WORK | ||
|
With the closure of SCARP's and transition of tubewells to the
farmers, the scope of SMO activities was curtailed in 1997-98. however,
research relating to (i) Salinity Survey, (ii) Institutionalized
Environmental Monitoring of Land & Water Conditions (IEM) and Left
Bank Outfall Drain (LBOD) Monitoring were assigned to SMO during 1999
through NDP funding. As the significance and importance of Land and Water
Monitoring / Evaluation Programme justifies its continuation on permanent
basis which was also endorsed by CDWP decision dated 21.012006 to help
assess the gravity of the waterlogging and salinity in the country and
suggest timely remedial measures for future investment in water
sector. | |||
| 3 | OBJECTIVES/BENEFITS | ||
| The proposed PC-II is to provide necessary data through continuous
land and water monitoring / evaluation programme with objectives mentioned
as under:- (a) Ground Water Monitoring | |||
| i) | Hydrological Monitoring of Depth to Watertable (DTW) | ||
| ii) | Depletion / Mining of Ground Water. | ||
| iii) | Deterioration of Ground Water Quality. | ||
| iv) | Pollution - Nature and Extent. | ||
| v) |
Shallow Tubewell Quality Monitoring. | ||
| (b) Surface Water Quality Monitoring | |||
| i) | Drainage Discharge and Rainfall Monitoring | ||
| ii) | Water Quality of Main Drains, Rivers, Lakes and Ponds. | ||
| iii) |
Nature and Extent of Industrial and Municipal
Pollutants. | ||
| (c) Soil Salinity Monitoring | |||
| i) | surface and Profile Salinity Monitoring of Resalinized canal commands on a years cycle basis. | ||
| ii) | Soil Salinity Evaluation in the Indus Plain. | ||
| iii) |
Bench mark data collection for new canal
command. | ||
|
The ultimate aim of the proposed survey, monitoring / evaluation
activities is to provide necessary data for planning and implementation of
strategic both short and long term to boost the agricultural economy in
the Indus Basin and also to overcome the difficulties due to salinity
hazardous. | |||
|
4 |
DATE OF COMMENCEMENT |
2008 | |
|
5 |
DATE OF COMPLETION |
2013 | |
|
6 |
PROJECT COST (As per PC-II) |
427.000
Million | |
|
7 |
SALIENT FEATURES | ||
|
8 |
PRESENT STATUS / PROGRESS PROGRESS ACHIEVED DURING JULY 2007 TO JUNE 2008 A. REGULAR WORK I. HYDROLOGIC MONITORING i) Total of 6437 depth to Watertable (DTW) points were observed bi-annually i.e. pre and post monsoon all over Pakistan. ii) Depth to Watertable maps i.e. pre & post monsoon (2007-2008) were prepared. II. WATER QUALITY MONITORING. i) 3711 water samples were collected from private tubewells, canals, drains, rivers, lakes & ponds for laboratory analysis. ii) Groundwater Quality Reports. The following reports were published during 2007-2008. | ||
| 1 | Publication on Water Quality of selected drains of Pakistan issued as SM-300 | ||
| 2 | Report on Water Quality of Cholistan issued under publication No.SM-301. | ||
| 3 | Draft report on Surface Water Quality of Indus Plain (2006-2007) is under process. | ||
| III. | SOIL SALINITY MONITORING | ||
|
i) |
Soil salinity survey has been completed for Rayya Branch, M.R.
Link, CBDC and Rohri South canal commands covering 3.064 million acres,
2243 auger holes were made upto 180 cm depth. Total of 8314 soil samples
were collected for surface and profile salinity
appraisal. | ||
|
ii) |
Soil salinity reports of Lower Jhelum and Rohri North canal
commands were published under Publication Nos. S&R - 59&60
respectively whereas, draft reports for Rayya Branch, M.R. Link, Central
Bari Doab canal (CBDC), Rohri South canal commands and data volume are in
progress. | ||
| IV. | ANALYSIS OF SOIL AND WATER SAMPLES | ||
|
8836 soil and 4597 water samples were collected by SMO field staff and provided by private agencies, were analysed in soil and water testing laboratories of SMO. | |||
|
9 |
INCHARGE OF THE PROJECT |
DIRECTOR, SMO WAPDA, 3-Canal Bank Mughalpura, Lahore Phone No.042-92050172 | |