Hydel GenerationSalient FeaturesPower StationsPerformanceMangla Dam
Tarbela DamWarsak Dam
Chashma Hydropower Project

Performance of
HYDEL POWER STATIONS
[01/07/2008 - 30/06/2009]

Tarbela
Installed Capacity
3478  
MW
Effective Capacity (Max.)
3714  
MW
Effective Capacity (Min.)
1884  
MW
Energy Generation
13952.83  
GWH
Auxiliary Consumption
6.644  
GWH
Maximum Load
3682  
MW
Plant Factor
45.8  
%
Availability Factor
92.82  
%
Mangla
Installed Capacity
1000  
MW
Effective Capacity (Max.)
1150  
MW
Effective Capacity (Min.)
496  
MW
Energy Generation
4797.425  
GWH
Auxiliary Consumption
161.216  
GWH
Maximum Load
1150  
MW
Plant Factor
54.77  
%
Availability Factor
987.92  
%
Warsak
Installed Capacity
243  
MW
Effective Capacity (Max.)
214  
MW
Effective Capacity (Min.)
173  
MW
Energy Generation
994.404  
GWH
Auxiliary Consumption
7.981  
GWH
Maximum Load
214  
MW
Plant Factor
46.78  
%
Availability Factor
84.51  
%
Chashma
Installed Capacity
184  
MW
Effective Capacity (Max.)
184  
MW
Effective Capacity (Min.)
42  
MW
Energy Generation
1096.91  
GWH
Auxiliary Consumption
8.57  
GWH
Maximum Load
184  
MW
Plant Factor
68.05  
%
Availability Factor
94.57  
%
Dargai
Installed Capacity
20  
MW
Effective Capacity (Max.)
18.5  
MW
Effective Capacity (Min.)
2  
MW
Energy Generation
107.41  
GWH
Auxiliary Consumption
0.358  
GWH
Maximum Load
18.5  
MW
Plant Factor
61.31  
%
Availability Factor
77.91  
%
Malakand (Jabban)

No parameters set against this source.

Rasul
Installed Capacity
22  
MW
Effective Capacity (Max.)
14  
MW
Effective Capacity (Min.)
1  
MW
Energy Generation
75.628  
GWH
Auxiliary Consumption
4.455  
GWH
Maximum Load
14  
MW
Plant Factor
39.24  
%
Availability Factor
89.75  
%
Shadiwal
Installed Capacity
13.5  
MW
Effective Capacity (Max.)
7.9  
MW
Effective Capacity (Min.)
1.4  
MW
Energy Generation
36.727  
GWH
Auxiliary Consumption
1.001  
GWH
Maximum Load
7.9  
MW
Plant Factor
31.06  
%
Availability Factor
95.03  
%
Nandipur
Installed Capacity
13.8  
MW
Effective Capacity (Max.)
9.2  
MW
Effective Capacity (Min.)
1.8  
MW
Energy Generation
36.974  
GWH
Auxiliary Consumption
1.479  
GWH
Maximum Load
9.2  
MW
Plant Factor
30.59  
%
Availability Factor
62.56  
%
Chichoki
Installed Capacity
13.2  
MW
Effective Capacity (Max.)
8  
MW
Effective Capacity (Min.)
2  
MW
Energy Generation
27.192  
GWH
Auxiliary Consumption
1.937  
GWH
Maximum Load
8  
MW
Plant Factor
23.52  
%
Availability Factor
87.75  
%
K/Garhi
Installed Capacity
4  
MW
Effective Capacity (Max.)
4  
MW
Effective Capacity (Min.)
2.6  
MW
Energy Generation
14.266  
GWH
Auxiliary Consumption
0.715  
GWH
Maximum Load
4  
MW
Plant Factor
40.71  
%
Availability Factor
86.7  
%
Renala
Installed Capacity
1.1  
MW
Effective Capacity (Max.)
0.8  
MW
Effective Capacity (Min.)
0.28  
MW
Energy Generation
3.442  
GWH
Auxiliary Consumption
0.033  
GWH
Maximum Load
0.8  
MW
Plant Factor
35.02  
%
Availability Factor
68.66  
%
Chitral
Installed Capacity
1  
MW
Effective Capacity (Max.)
1  
MW
Effective Capacity (Min.)
1  
MW
Energy Generation
4.821  
GWH
Auxiliary Consumption
0.016  
GWH
Maximum Load
1.077  
MW
Plant Factor
55.03  
%
Availability Factor
82.87  
%
Ghazi Barotha
Installed Capacity
1450  
MW
Effective Capacity (Max.)
1450  
MW
Effective Capacity (Min.)
870  
MW
Energy Generation
6487.737  
GWH
Auxiliary Consumption
77.784  
GWH
Maximum Load
1450  
MW
Plant Factor
51.08  
%
Availability Factor
93.06  
%

Notes:
1. TARBELA AND MANGLA POWER STATIONS CAN BE OVERLOADED DURING SUMMER.


[the authority
[power wing
[water wing
[information technology
[ongoing projects
[investors information
[future projects
[customer services
[training
[news & media
[home [back