Tarbela
|
Installed Capacity
|
3478
|
MW
|
Effective Capacity (Max.)
|
3714
|
MW
|
Effective Capacity (Min.)
|
1884
|
MW
|
Energy Generation
|
13952.83
|
GWH
|
Auxiliary Consumption
|
6.644
|
GWH
|
Maximum Load
|
3682
|
MW
|
Plant Factor
|
45.8
|
%
|
Availability Factor
|
92.82
|
%
|
Mangla
|
Installed Capacity
|
1000
|
MW
|
Effective Capacity (Max.)
|
1150
|
MW
|
Effective Capacity (Min.)
|
496
|
MW
|
Energy Generation
|
4797.425
|
GWH
|
Auxiliary Consumption
|
161.216
|
GWH
|
Maximum Load
|
1150
|
MW
|
Plant Factor
|
54.77
|
%
|
Availability Factor
|
987.92
|
%
|
Warsak
|
Installed Capacity
|
243
|
MW
|
Effective Capacity (Max.)
|
214
|
MW
|
Effective Capacity (Min.)
|
173
|
MW
|
Energy Generation
|
994.404
|
GWH
|
Auxiliary Consumption
|
7.981
|
GWH
|
Maximum Load
|
214
|
MW
|
Plant Factor
|
46.78
|
%
|
Availability Factor
|
84.51
|
%
|
Chashma
|
Installed Capacity
|
184
|
MW
|
Effective Capacity (Max.)
|
184
|
MW
|
Effective Capacity (Min.)
|
42
|
MW
|
Energy Generation
|
1096.91
|
GWH
|
Auxiliary Consumption
|
8.57
|
GWH
|
Maximum Load
|
184
|
MW
|
Plant Factor
|
68.05
|
%
|
Availability Factor
|
94.57
|
%
|
Dargai
|
Installed Capacity
|
20
|
MW
|
Effective Capacity (Max.)
|
18.5
|
MW
|
Effective Capacity (Min.)
|
2
|
MW
|
Energy Generation
|
107.41
|
GWH
|
Auxiliary Consumption
|
0.358
|
GWH
|
Maximum Load
|
18.5
|
MW
|
Plant Factor
|
61.31
|
%
|
Availability Factor
|
77.91
|
%
|
Malakand (Jabban)
|
No parameters set against this source.
|
Rasul
|
Installed Capacity
|
22
|
MW
|
Effective Capacity (Max.)
|
14
|
MW
|
Effective Capacity (Min.)
|
1
|
MW
|
Energy Generation
|
75.628
|
GWH
|
Auxiliary Consumption
|
4.455
|
GWH
|
Maximum Load
|
14
|
MW
|
Plant Factor
|
39.24
|
%
|
Availability Factor
|
89.75
|
%
|
Shadiwal
|
Installed Capacity
|
13.5
|
MW
|
Effective Capacity (Max.)
|
7.9
|
MW
|
Effective Capacity (Min.)
|
1.4
|
MW
|
Energy Generation
|
36.727
|
GWH
|
Auxiliary Consumption
|
1.001
|
GWH
|
Maximum Load
|
7.9
|
MW
|
Plant Factor
|
31.06
|
%
|
Availability Factor
|
95.03
|
%
|
Nandipur
|
Installed Capacity
|
13.8
|
MW
|
Effective Capacity (Max.)
|
9.2
|
MW
|
Effective Capacity (Min.)
|
1.8
|
MW
|
Energy Generation
|
36.974
|
GWH
|
Auxiliary Consumption
|
1.479
|
GWH
|
Maximum Load
|
9.2
|
MW
|
Plant Factor
|
30.59
|
%
|
Availability Factor
|
62.56
|
%
|
Chichoki
|
Installed Capacity
|
13.2
|
MW
|
Effective Capacity (Max.)
|
8
|
MW
|
Effective Capacity (Min.)
|
2
|
MW
|
Energy Generation
|
27.192
|
GWH
|
Auxiliary Consumption
|
1.937
|
GWH
|
Maximum Load
|
8
|
MW
|
Plant Factor
|
23.52
|
%
|
Availability Factor
|
87.75
|
%
|
K/Garhi
|
Installed Capacity
|
4
|
MW
|
Effective Capacity (Max.)
|
4
|
MW
|
Effective Capacity (Min.)
|
2.6
|
MW
|
Energy Generation
|
14.266
|
GWH
|
Auxiliary Consumption
|
0.715
|
GWH
|
Maximum Load
|
4
|
MW
|
Plant Factor
|
40.71
|
%
|
Availability Factor
|
86.7
|
%
|
Renala
|
Installed Capacity
|
1.1
|
MW
|
Effective Capacity (Max.)
|
0.8
|
MW
|
Effective Capacity (Min.)
|
0.28
|
MW
|
Energy Generation
|
3.442
|
GWH
|
Auxiliary Consumption
|
0.033
|
GWH
|
Maximum Load
|
0.8
|
MW
|
Plant Factor
|
35.02
|
%
|
Availability Factor
|
68.66
|
%
|
Chitral
|
Installed Capacity
|
1
|
MW
|
Effective Capacity (Max.)
|
1
|
MW
|
Effective Capacity (Min.)
|
1
|
MW
|
Energy Generation
|
4.821
|
GWH
|
Auxiliary Consumption
|
0.016
|
GWH
|
Maximum Load
|
1.077
|
MW
|
Plant Factor
|
55.03
|
%
|
Availability Factor
|
82.87
|
%
|
Ghazi Barotha
|
Installed Capacity
|
1450
|
MW
|
Effective Capacity (Max.)
|
1450
|
MW
|
Effective Capacity (Min.)
|
870
|
MW
|
Energy Generation
|
6487.737
|
GWH
|
Auxiliary Consumption
|
77.784
|
GWH
|
Maximum Load
|
1450
|
MW
|
Plant Factor
|
51.08
|
%
|
Availability Factor
|
93.06
|
%
|