Middle Spat Gah HydroPower Project

 

 Location SPAT GAHMiddle Spat Gah is located on Gabarband Gah, a right bank tributary of Spat Gah with confluence 8 km downstream of Dasu town in Kohistan District, Khyber Pakhtunkhawa. The project layout has been planned on the left bank with powerhouse 22 km from Dasu and 384 km from Islamabad.
Salient Features
Installed Capacity  489 MW
Gross Head  775 M
Rated Net Head  707 M
Design Discharge  82 m3/sec
Mean Annual Energy  1895 GWH
No. & Type of Turbine  3, Pelton
Type of Dam  CFRD
Height of Dam  94 M
Headrace Tunnel  6.4 km
Pressure Shaft  1100 M
Construction Period  05 Years
Estimated Project Cost  682 Million US$

 

Status

  • Pre-feasibility study has been completed in year 2008.