Murunj Dam Project
 

Murunj Dam Project

Location
The Project is proposed across Kaha Nullah at about 116 km West of District Rajanpur.
Salient Features
  • Type of Dam

Earth Core Rock Fill  
  • Height of Dam

107 ft.
  • Gross Storage

0.80 MAF
  • Live Storage

0.60 MAF
  • GCA  

120,000 Acres
  • Power Generation

12 MW

Scope of Work

Feasibility Study, Detailed Engineering Design and Preparation of Tender Documents

Execution by

WAPDA

Donor Agency

Govt. of Pakistan

Commencement Date

-

Completion Date

-

Financial Status (Rs. Million)

Local Foreign Total

Approved PC-I Cost (03.09.2009)

349.956 - 349.956

PSDP Allocation for 2019-2020

100.000 - 100.000

Status:-

  • CDWP in its meeting held on 12.02.2018 approved the PC-II for Feasibility Study, Detailed Engineering Design & Preparation of Tender Documents at a rationalized cost of Rs. 349.956 Million.
  • Hiring of Consultancy Services is in process.
  • WAPDA Authority in its meeting held on 30.05.2019 approved the technical evaluation of shortlisted firms and granted permission for opening of financial bid.
  • The evaluation of Financial bids is in progress. 
Read 3730 times