Located on Bara River at the confluence of the Mastura River in Khyber Agency (now KP), the project has a proposed construction time of 5 years and has not yet commenced.
| Type of Dam | Earth Core Rockfill |
| Height of Dam | 92 m |
| Length of Dam | 1477 ft |
| Gross Storage | 85,363 AF |
| Live Storage | 62,434 AF |
| CCA | 41,729 Acres |
| Power Generation | 5.8 MW (38.10GWh) |
