|
PC-II for preparation of feasibility study of one of the
most promising site on Chor Nullah was submitted to
Govt. of Pakistan on 09.01.2004 through Ministry of
Water & Power. The Govt. of Pakistan has approved the
project for feasibility study at a total cost of
Rs.196.684 million with FEC of Rs.113.889 million.
Foreign cost component and cost of field investigation
for Chor Nullah Hydropower Project will be met through
Euro 5 Million (Rs.370 Million) KFW grant whereas local
cost will be met through PSDP.
|