LOWER PALAS VALLEY (CHOR NULLAH) HYDROPOWER PROJECT

Location

Palas Valley is the left bank tributaries of Indus River in Kohistan District, Khyber Pukhtunkhwa. The confluence of Chor nullah (Palas Valley) is located 12 km upstream of Patan town. The project is located 335 km from Islamabad.

Scope of Work
Feasibility study of Lower Palas Hydropower Projects.
Objectives/Benefits
As per Phase-I study, Lower Palas Scheme (665 MW) is ranked first and taken up for Feasibility Study. The other identified projects are Middle Palas (373 MW) and Upper Palas (160 MW)
Date of Commencement 
 August 2006
Date of Completion
 June 2010
Project Cost As Per PC-II
PC-II approved by CDWP on 07.03.2005 for Rs.196.684 Million with FEC of Rs.113.118 Million.
SALIENT FEATURES
Power MW 665
Mean Annual Energy GWH 2658
Design Discharge m3/s 101
Gross Head M 805
Type of Dam Concrete gravity
Height of Dam m 85
No. & Type of Turbine 3, Pelton
Project Base cost US$ 763.6 Million
PROJECT CONSULTANTS
JV of M/s ILF Germany (Lead Partner) POYRY, ACE.
PRESENT STATUS/PROGRESS  

 

·        The studies of Hydropower Project on Palas Valley (Chor Nullah) was carried out by Consultants M/s ILF of (Germany), POYRY (Australia) and ACE (PAK) with financing grant from KfW of Germany.

.        As per Phase-I study, Lower Palas Scheme (665 MW) is ranked first to be taken up for feasibility study. The other identified Projects are Middle Palas (373 MW) and upper Palas (160 MW). The Consultants submitted feasibility report of 665 MW Lower Palas Scheme in June, 2010.

.       WAPDA Authority in its meeting on 31.08.2010 has decided to implement Lower Palas Hydropower Project in Public Private Partnership (PPP) mode. EOI documents for PPP mode have been prepared in consultation with CCC. WAPDA and IPDF, Islamabad.

·        EOI documents have been issued to interested sponsors. Four bids were received and evaluated. The recommendations made by Evaluation Committee were approved by Authority on 20.03.2012. Authorities recommend M/s Daewoo Engineering Consortium of Korea for 665 MW Lower Palas Valley Hydroower Project. WAPDA has issued Letter of Acceptance to M/s K-Water & Daewoo Engineering Consortium.

.        Prior to invite private sector for further negotiation to finalized the PPP modalities, the mater was discussed with Govt. of Khyber Pakhtunkhwa regarding % age equity share with public sector. Government of Khyber Pakhtunkhwa intends to contribute 25% of the equity share. WAPDA would contribute 1% of the equity share.

·        A meeting among WAPDA, PPIB, Board of Investment, Planning Division, Finance

         Division, Government of Khyber Pakhtunkhwa and Ministry of Water & Power was held on 29th

         August, 2012 at Islamabad and the following decisions were made:-

       1. PPIB shall handle the Lower Palas Valley Hydropower project onwards under the Provisions

             of "Policy for Power Generation-2002".

       2. Government of Khyber Pakhtunkhwa as an equity Partner shall be involved in the decision

             making regarding the projects.

·        MOU between Public and Private Sector Sponsors has been signed on 24.12.2012.

 

·        Draft of Joint Public Development Agreement (JDA) has been prepared and circulated among various WAPDA Organization for review/comments.

.        Technical due diligence by the Private Sponsor has been finalized.

 

Incharge of the Project
 Engr Hasnain Afzal
 General Manager (Hydro) Planning.
 WAPDA Sunny View Lahore
 Contact No. 0092-42-99202717
 Mobile No. 0092-0300-8411244

Updated 15.04.2013