· Feasibility
study was completed by HPO WAPDA in collaboration
with GTZ of Germany in 2003.
· Consultancy
agreement for detailed Engineering Design and
Preparation of tender documents have been signed
between WAPDA (Hydro) Planning & Phandar Hydro
consultants JV on 22.10.2010.
. Hydrographic
survey of Phandar Lake and Ghizar River is completed
by ISRIP, WAPDA Report has been submitted to the
Consultants. ort.
.
Topographic survey of important structures is
completed by T&M Division, WAPDA, Peshawar. Report
has been submitted to the Consultants.
.
Required 150 m drilling has been completed by Dams
Investigation Division (DID), WAPDA.
.
CMTL, WAPDA has completed the seismic refraction
survey and other geo-technical investigation.
Results/Report have been submitted to the
Consultants. Consultants have submitted Design
Memorandum to WAPDA for review and comments.
.
Comments on design memorandum offered by WAPDA Organizations have
been sent to Consultants for consideration
in the final design.
Incharge
of the Project
Engr.
Hasnain Afzal
General Manager (Hydro) Planning
Wapda Sunny View, Lahore.
Contact No. 0092-42-99202717
Mobile No. 0092-0300-8411244
|